← Back to Engineering Tools
Tooling and Process Planning · Released

Tool Life Planning

Turn an expected tool life into a practical change-plan for a production batch.

Parts per tool
—
Tools required
—
Production plan

Planning method

Parts per tool = usable tool life ÷ cutting time per part. The planning reserve reduces calculated capacity before required tool quantity is rounded up.

Use verified life data whenever possible. A conservative reserve is appropriate when material variability, interrupted cuts, long overhang, or unattended production may reduce actual life.